Studio Build 4: From Start to Finish
STUDIO SHED 4 concrete foundation
STUDIO SHED 4 structure erected without roof. Showing waterproofing
STUDIO SHED 4 structure erected without roof. Showing waterproofing
STUDIO SHED 4 with metal corner leaning against wall
STUDIO SHED 4 metal roof
STUDIO SHED 4 roof completed, no siding
STUDIO SHED 4 siding installed
STUDIO SHED 4 ceiling with wiring
STUDIO SHED 4 interior with wiring
STUDIO SHED 4 interior with wiring
STUDIO SHED 4 insulation in process
STUDIO SHED 4 drywall taped and mudded with dehumidifier running and finished floor protected
STUDIO SHED 4 drywall taped and mudded with dehumidifier running and finished floor protected
STUDIO SHED 4 drywall hung and dehumidifier working
STUDIO SHED 4 drywall hung
STUDIO SHED 4 drywall hung
STUDIO SHED 4 interior finished back wall
STUDIO SHED 4 interior finished back wall
STUDIO SHED 4 interior finished
STUDIO SHED 4 ceiling finished with smoke detector
STUDIO SHED 4 front door from inside
STUDIO SHED 4 front door with corner taped in place with glue sets
STUDIO SHED 4 finished front door
STUDIO SHED 4 exterior fully finished